"In June, 1982, construction began on this 4 mile, 6.4 km. bridge across Tampa Bay, Florida. The main span cable-stayed structure, with a precast deck superstructure, was designed by Figg & Muller, the approaches were designed by the Florida Dept. of "
Price: "10"